Installation
If installed in the ground or in a sloping site, we recommend backfilling to natural ground level immediately after installation.
A small load of water equalling no more than one third of the capacity may be placed in the tank to ensure stability.
Gradual filling is recommended over a period of weeks.
Your tank will settle into your prepared site over time, and last a lifetime.
Refer to our Technical Support page for Water Tank Site Preparation and Delivery information